
The Europa Centre
HQ Cabling Services was commissioned to upgrade the network infrastructure and install a new Paxton Door Access System at The Europa Centre, improving both connectivity
HQ Cabling Services was commissioned to upgrade the network infrastructure and install a new Paxton Door Access System at The Europa Centre, improving both connectivity
HQ Cabling Services was tasked with upgrading the fibre optic infrastructure at Royal Neuro Hospital in London to enhance network performance and reliability. The project
HQ Cabling Services was commissioned to enhance the network infrastructure at Darrick Wood School by installing new CAT6 network cabling to support Bode IP speakers
Introduction Albion Foods, is a job we undertook working under Select Technology an IT support company based in Kent. Albion Foods is a leading food
Aim The London Beer factory is a brewery and tap room based in South east London. The owners asked HQ Cabling Solutions to provide two
Aim To supply, design and install a full site network and fibre infrastructure and 74x IP CCTV security system within our clients new 169,000ft2 industrial
Aim To install 14x new Audio-Visual cabling kits within classrooms, removing all existing AV cabling from projectors to teaching desks. Classroom refurbishment- Installation of new
Aim To supply, design and install an LED Lighting system to cover the 55 ft2 industrial warehouse. HQ were given the opportunity to prepare a
Aim HQ Cabling Services was contacted by Ontech Solutions Ltd to carry out the installation of 17x Samsung 65” LED display screens with electrical, AV